CANLI
xAI, Imagine API’yi 2.0’a Yükseltmeye Hazırlanıyor: Görüntü ve Video Tek…·Microsoft MAI-Cyber-1-Flash’ı Duyurdu·Moonshot AI, Kimi K3 Model Ağırlıklarını ve Teknik Raporunu Açık…
14 Oct 2026 · 23:30 GMT+3
Ai Haber – Türkiyenin Yapay Zeka Haber Portalı
ARAşTıRMA · MAKINE ÖğRENMESI arXiv:2610.18853 13 Eki 2026 · v1

Two Clocks: Why Larger Rollout Batches Learn Slower but Fail on Schedule in Reinforcement Learning with Verifiable Rewards

Yuante Li, Junwei Quan, Kai Qiu, Kate Zhang, Yicheng Tao

YAYIN:13 Eki 2026 ALAN:cs.LG OKUMA:4

Özet

Reinforcement learning with verifiable rewards (RLVR) relies on costly model-generated responses, motivating larger rollout batches and square-root learning-rate scaling. Reported to approximately preserve progress per sample with one optimizer step per rollout, this rule is less understood in practical multi-step training. We develop a two-clock framework that separates the samples needed to make progress from those consumed before collapse. Under a local quadratic model, the square-root rule preserves first-order drift per sample but not progress: larger batches take fewer, longer updates and lose more to curvature, yielding a learning-rate-dependent critical batch beyond which sample efficiency degrades. A drift-threshold hypothesis predicts a complementary failure clock whose sample count remains approximately invariant along the square-root rule. Controlled GRPO experiments on Qwen2.5-Math-1.5B across a $16times$ batch range support both predictions. Ratio clipping delays failure, especially for larger batches, but the progress gap persists without it. Widening the clip trades stability for a transient speed gain. The progress gap reappears on another dataset, a general-purpose checkpoint, and a 7B model. Finally, we use the two-clock framework to derive a simple multi-step RLVR schedule: start below the critical batch and switch to a larger batch before failure. Our code is available at: https://github.com/WinstonLiyt/two-clocks-rlvr.

Özetle: Reinforcement learning with verifiable rewards (RLVR) relies on costly model-generated responses, motivating larger rollout batches and square-root learning-rate scaling.

Özet

Reinforcement learning with verifiable rewards (RLVR) relies on costly model-generated responses, motivating larger rollout batches and square-root learning-rate scaling. Reported to approximately preserve progress per sample with one optimizer step per rollout, this rule is less understood in practical multi-step training. We develop a two-clock framework that separates the samples needed to make progress from those consumed before collapse. Under a local quadratic model, the square-root rule preserves first-order drift per sample but not progress: larger batches take fewer, longer updates and lose more to curvature, yielding a learning-rate-dependent critical batch beyond which sample efficiency degrades. A drift-threshold hypothesis predicts a complementary failure clock whose sample count remains approximately invariant along the square-root rule. Controlled GRPO experiments on Qwen2.5-Math-1.5B across a $16times$ batch range support both predictions. Ratio clipping delays failure, especially for larger batches, but the progress gap persists without it. Widening the clip trades stability for a transient speed gain. The progress gap reappears on another dataset, a general-purpose checkpoint, and a 7B model. Finally, we use the two-clock framework to derive a simple multi-step RLVR schedule: start below the critical batch and switch to a larger batch before failure. Our code is available at: https://github.com/WinstonLiyt/two-clocks-rlvr.

Orijinal Özet (İngilizce)

Reinforcement learning with verifiable rewards (RLVR) relies on costly model-generated responses, motivating larger rollout batches and square-root learning-rate scaling. Reported to approximately preserve progress per sample with one optimizer step per rollout, this rule is less understood in practical multi-step training. We develop a two-clock framework that separates the samples needed to make progress from those consumed before collapse. Under a local quadratic model, the square-root rule preserves first-order drift per sample but not progress: larger batches take fewer, longer updates and lose more to curvature, yielding a learning-rate-dependent critical batch beyond which sample efficiency degrades. A drift-threshold hypothesis predicts a complementary failure clock whose sample count remains approximately invariant along the square-root rule. Controlled GRPO experiments on Qwen2.5-Math-1.5B across a $16times$ batch range support both predictions. Ratio clipping delays failure, especially for larger batches, but the progress gap persists without it. Widening the clip trades stability for a transient speed gain. The progress gap reappears on another dataset, a general-purpose checkpoint, and a 7B model. Finally, we use the two-clock framework to derive a simple multi-step RLVR schedule: start below the critical batch and switch to a larger batch before failure. Our code is available at: https://github.com/WinstonLiyt/two-clocks-rlvr.

Kaynak: arXiv:2610.18853 · PDF

BibTeX

@article{li2026two,
  title   = {Two Clocks: Why Larger Rollout Batches Learn Slower but Fail on Schedule in Reinforcement Learning with Verifiable Rewards},
  author  = {Yuante Li and Junwei Quan and Kai Qiu and Kate Zhang and Yicheng Tao},
  journal = {arXiv preprint arXiv:2610.18853},
  year    = {2026},
  url     = {https://arxiv.org/abs/2610.18853}
}

Tartışma

Bu habere emoji ile tepki ver

Hizli:

Henüz yorum yok. İlk yorumu siz yapın!

Yapıcı ve saygılı yorumlar bekliyoruz. Topluluk kuralları